menu1.jpg (2245 bytes)
SideMenu_23.gif (3633 bytes)
SideMenu_24.gif (2695 bytes)
SideMenu_25.gif (2165 bytes)

Hospitals & Universities > Naval Medical Center, San Diego (NMCSD)


  
This 2,000,000 square foot hospital complex has been undergoing an energy retrofit for the past two years, with an estimated construction cost of $9,000,000.  Our energy retrofit project within this larger project has totaled approximately $3,000,000 to date, with the next phase expected to be released in February 2001, with an estimated construction cost of $2,000,000.

The project included the addition of variable speed drives to the majority of the fan systems in the main buildings, the replacement of the corroded cooling coils in the 1,000,000 square foot facility, the upgrade of the economizer systems, the replacement of the variable pitch vane-axial fan systems with fixed pitch hubs and variable speed drives to improve the reliability and energy performance and DDC control system sequences to trim energy waste.

 

 

 

 

Camp Pendleton Naval Hospital | Naval Medical Center
University Of California  (UCSD) |
Southern California University