ROI teamed up with a large production
engineering house for this project. A 3,200,000 gallon chilled water based TES
system was added to the campus, and the piping connections to 32 buildings were modified
to coordinate the operations with the TES system.
There had
been several additions of chillers to the chiller plant, and the 24" and 30"
piping within the plant spanned approximately 75 yards. The main 36" feeds left
the plant in two locations, so obtaining a common return point proved to be very
interesting. There was quite a spaghetti-mess of piping there.
The system
reduced operating costs approximately 40% greater than anticipated, and with the recent
rate hikes in San Diego, the savings have been even more spectacular.
This is the largest TES system on the SDG&E
power Grid.
|