| Office Buildings |
Click on the
Images for more detailed information about our project and the results we were able to
acheive. |

|
8383 Wilshire.This retrofit project started out with the aim of reducing
the energy consumption at this 417,463 square foot office tower located in Beverly Hills,
CA. The original design of the HVAC system utilized discharge static pressures as
high as 6.0 inches W.C., and had 1,250 kW worth of electric heat installed, as well as
1,000 HP of constant speed, backward inclined supply fans. |
701 B. Street
This
540,000 square foot facility was chronically short of cooling capacity, and had been
having problems meeting the cooling load for over ten years prior to our involvement. The penthouse supply fan systems were routinely at
full pitch and full fan amps by 10:00 in the morning if the weather was 72°F or higher. Above 80°F ambient, the supply air temperature
rose almost proportionally with the ambient conditions. |

|
|
|