The original intent of this project was
to reduce the tenant complaints and replace failing equipment at this 350,000 square foot
24 story office tower located in San Diego, CA. The secondary goal was to reduce
operating expenses, and make the HVAC system easier to manipulate by the operating
engineers.
The tenant
complaints were reduced from an average of 19 calls per day to an average of 6 calls per
week, a reduction of 94%. This occurred in spite of the fact that the overall energy
consumption of the facility was reduced by approximately 30% while the occupancy of the
facility has increased by DW%. |