Several years back, we developed a
substantial analysis, encompassing several hundred pages of computer runs, as well as
construction cost estimates from a large nationwide mechanical contractor to determine the
most cost effective means to provide air conditioning to a building. Back in the old days, when chillers routinely
operated at 0.90 kW input per ton of cooling output, other firms had determined that 55°F
supply air temperatures provided the best blend of chiller plant and air distribution
system efficiencies.
Today, with
the advent of 0.45 kW per ton constant speed chillers, and variable speed chillers that
run in the 0.30 to 0.35 kW per ton range for most of the year, as well as the use of
Thermal Energy Storage during peak hours of the day, the fixed 55°F supply air
temperature requirement is no longer valid for most buildings.
On most
retrofit projects, we typically incorporate a continually resettable supply air
temperature software routine that minimizes the chiller plant and air distribution system
energy. An integral part of this routine is
the recognition that chiller efficiency changes almost linearly with load and temperature
changes, while variable speed drive equipped fan energy responds in a nearly cubic
relationship with load and temperature differential.
Where
TES is involved, we typically size the storage capacity slightly larger than would
typically be selected by other firms, and then use this extra cooling capacity to reduce
the supply air temperature of the AHUs. A 10% reduction in fan
volume made possible by supplying colder air typically results in fan energy savings in
excess of 20%. On
most projects we are able to reduce fan volume by 20% to 25% on peak load days, thus
making the TES system that much more cost effective.
|