The Principals of ROI, either while at
ROI or during previous employment, have had substantial involvement with many different
Thermal Energy Storage projects.
We
specialize in energy efficient Thermal Energy Storage system design, especially for
facilities with "critical nature" 24 hour per day cooling loads.
As a
sampling of the energy efficient nature of our designs, we offer the following brief
descriptions:
The
Challenger Memorial Youth Center detention facility TES
system uses approximately 30% less energy than a typical central plant facility. The net first cost on this system was zero after
engineering revisions and the Utility incentive was applied.
The
Pitchess Honor Rancho TES system uses approximately 25% less energy than a typical central
plant facility. This TES system is powered
from a 22 MegaWatt natural gas fired cogeneration plant, and is used to balance the
electrical demand on the cogeneration facility.
The Los
Angeles Department of Water and Computer Operations Facility TES system reduced energy
consumption by approximately 2,900,000 kWh's annually when compared to the original
design.
n addition
to the vast background in the design and analysis of TES projects, the Principals of ROI
have provided Southern California Edison, the Los Angeles Department of Water and Power,
and numerous private clients with in-depth reviews of TES Feasibility Analyses and TES
system designs which have been performed by other engineering firms.
These
reviews have resulted in substantial savings to the owners of the systems being analyzed. We provide this service to our clients as a first
step in our system design efforts.
We have
provided services directly to SCE and DWP concerning Feasibility Analysis for their own
facilities, as well as being retained to assist them in the trouble shooting of several
problem TES projects.
Our
concentrated experience in the TES field is second to none.
We have the necessary background to provide the client with a simple,
straightforward TES system design which will provide the operational staff with many
worry-free hours of operation.
Our
experience does not end with TES system design and commissioning. Over the years, we
have spent untold hours working with SCE and DWP in the refinement of their TES programs
and rate structures to get the most reality-based programs possible and best
use of ratepayer dollars.
Other
projects are described in the following text. The list is not complete, and is meant to
display a variety of system types and applications.
We have
performed feasibility studies, system design, startup testing, troubleshooting and/or
commissioning of the following projects:
|