Measurement and verification has been an integral part of our project success since the
mid-1980's when we started designing our own TES systems for clients. We had witnessed dozens of marginal/inadequate TES
systems get designed and installed, and did not want this to occur on any of our projects. To avoid this, we studied each failed system
we could find, determined where the weak links were, and developed our own cures for the
problems.
To make sure
that the manufacturers and installers complied with the design intent and performance
specifications for our systems, we developed an M&V and testing protocol long before
ASHRAE was able to get one developed and accepted by the consensus process.
More
recently with the advent of the California Utility administered Standard Performance
Contract energy efficiency incentive programs, a substantial M&V requirement has
arrived, in order to prove that the system is providing the savings promised. Based on our experience with these systems and the
utility requirements, we are able to cost effectively perform these services for our
clients.
We typically
utilize the M&V system as a part of our Commissioning process, to determine where
operational changes make the most difference, and which changes improve system overall
performance, and which changes should be discarded.
The
substantial use of the M & V equipment and systems has allowed us to hone our
sequences of operations to minimize energy costs and maximize tenant comfort. |